
Lots of guys at the site.
HVC guys are doing their thing. Did I mention that we need two furnaces and three air conditioners? *sigh*
Plumbing guys have finished the rough, um, plumbing.
And the electrical guys have put in a LOT of metal housings for lights, outlets, switches and the like.
Why does the page of our electrical drawings remind me of
this?