Wednesday, June 6, 2007

inside the walls




Lots of guys at the site.

HVC guys are doing their thing. Did I mention that we need two furnaces and three air conditioners? *sigh*

Plumbing guys have finished the rough, um, plumbing.

And the electrical guys have put in a LOT of metal housings for lights, outlets, switches and the like.

Why does the page of our electrical drawings remind me of this?

No comments: